(Optional) Assemble the SFP+ Cables
Note -
The LC connector and SFP+ receptacles are keyed for proper fitting.
7.
Push the connector into the transceiver until it clicks.
8.
Repeat from
for all SFP+ optical transceivers and LC connectors.
9.
Repeat from
for all data cables to be assembled.
10.
Route the data cables.
Related Information
■
“Chassis Cable Requirements” on page 51
■
“I/O Module Cable Requirements” on page 52
■
“Standard MT and PrizmMT Cables” on page 53
■
“Standard MT and PrizmMT Cable Precautions” on page 55
■
“General Cable Precautions” on page 56
Connecting Cables
61
Summary of Contents for Fabric Interconnect F2-12
Page 1: ...Oracle Fabric Interconnect F2 12 Installation Guide Part No E74400 01 November 2016...
Page 2: ......
Page 8: ...8 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 10: ...10 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 22: ...22 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 88: ...88 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...
Page 118: ...118 Oracle Fabric Interconnect F2 12 Installation Guide November 2016...