Installing the Fabric Interconnect F1-4 in a 4-Post Rack
FIGURE 23
Power Cord Anchor
The power cord management system consists of:
■
two (2) plastic anchors, one per mounting bracket. Each anchor has slots at the bottom and
top.
■
two (2) tie wraps, one for each power cord. Each tie wrap is reusable and has a tab that
allows for loosening and tightening the tie wrap. The tie wraps are part of the accessory kit
that comes in the shipping container.
When the tie wrap is inserted through both slots in the anchor, it wraps the cable and secures it
in place.
■
After each power cord is anchored, check the amount of protrusion (the distance that the
anchored power cord stands out from the face of the Fabric Interconnect. The power cord
can protrude a maximum of 2 5/16” (60 mm).
It is a best practice to tie the power cords so that they protrude no more than the documented
distance.
■
After each power cord is anchored and complies with the protrusion limits, clip the tie wrap
with no more than an inch of spare length.
It is a best practice to clip the cable tie wraps to the documented length. By doing so, you
allow enough tie wrap length to make adjustments to the cable bend radius and protrusion
distance at a later date (if needed).
Installing the Fabric Interconnect
47
Summary of Contents for Fabric Interconnect F1-15
Page 1: ...Oracle Fabric Interconnect Hardware User s Guide Part No E50997 04 July 2016...
Page 2: ......
Page 8: ...Contents Index 173 8 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Page 10: ...10 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Page 94: ...94 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Page 168: ...168 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Page 172: ...172 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Page 176: ...176 Oracle Fabric Interconnect Hardware User s Guide July 2016...