Upgrade a Fabric Interconnect F1-4 to a QDR Fabric Board
first Fabric Interconnect. When the first Fabric Interconnect boots up with a
QDR Fabric Board, move all traffic off of the second Fabric Interconnect and
upgrade that Fabric Interconnect to a QDR Fabric board.
■
In a single Fabric Interconnect environment, stop all traffic going through
the chassis. For example, scheduled traffic, such as backups, can be halted.
You can also turn down vNICs, vHBAs, or Server Profiles. Or, live traffic will
be halted when you power off the Fabric Interconnect.
3.
Remove the InfiniBand cables from your DDR Fabric Board, and disconnect the
Fabric Interconnect from facility power by unplugging the power cables.
4.
Using a screwdriver, loosen the captive screws in the release levers by turning
them counterclockwise (1) as shown in
Figure 87, “Unlocking the DDR Fabric
Board in a Fabric Interconnect F1-4,” on page 135
FIGURE 87
Unlocking the DDR Fabric Board in a Fabric Interconnect F1-4
Performing Service Tasks
135
Summary of Contents for Fabric Interconnect F1-15
Page 1: ...Oracle Fabric Interconnect Hardware User s Guide Part No E50997 04 July 2016...
Page 2: ......
Page 8: ...Contents Index 173 8 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Page 10: ...10 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Page 94: ...94 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Page 168: ...168 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Page 172: ...172 Oracle Fabric Interconnect Hardware User s Guide July 2016...
Page 176: ...176 Oracle Fabric Interconnect Hardware User s Guide July 2016...