![background image](http://html1.mh-extra.com/html/omron/cxone-ald-v4-10-2010/cxone-ald-v4-10-2010_operation-manual_743059137.webp)
121
Segment Program 3 (Block Model 158)
Section 6-19
4: Realtime Trend Graph Legend
The realtime trend graph line color is indicated using a label and a Rectangle.
(X1: Green Y1: Yellow)
5: AT Command
The AT command for the PID block designated by ITEM 032 is executed, and
the result is written in the AT result reflection bank number designated by
ITEM 027: AT_PIDNO. The bank number is set in the storage destination
bank number. When the bank number is “0,” the current bank (the bank num-
ber designated in the execution step) is selected.
6: Program Setting
This button opens the Program Setting Screen for Segment Program 3. The
following screen is the Tuning Screen for Segment Program 3 built using Face
Plate Auto-Builder for NS in 640
×
480 screen resolution.
The display and operation of each object in the face plate is the same as the
version for 800
×
600 screen resolution.
Summary of Contents for CXONE-ALD-V4 - 10-2010
Page 2: ......
Page 4: ...iv...
Page 6: ...vi...
Page 14: ...xiv...
Page 22: ...6 Upgrades Made for Version 3 1 Section 1 6...
Page 28: ...12 Uninstalling the Face Plate Auto Builder for NS Section 2 2...
Page 29: ...13 SECTION 3 Basic Operation Flow 3 1 Basic Operation Flow 14...
Page 40: ...24 Merging Projects Section 4 2...
Page 142: ...126 Segment Program 3 Block Model 158 Section 6 19...
Page 144: ...128 Revision History...