10.4 Dismantling of the fresh water installation (optional)
L
Le
ea
ak
kss
All hydraulic connections must be properly tightened
and newly sealed during installation.
10.5 Dismantling of the pump group with heating controller
The pump group can be equipped with one or two heating circuits. A detailed description of the components
and connections can be found under Hydraulic connections in
The pump group
chapter.
Note:
Check that all cables to the heating controller have been disconnected and pulled back.
Figure 1: First disconnect all hydraulic connections and then the mounting of the frame.
Figure 2: Lift off the pump group as a unit (including heating controller and wiring).
PE 607 USA_FA 2.1
32
Summary of Contents for PELLEMATIC SmartXS
Page 29: ...Dismantling of the housing parts 29 Installation Manual PELLEMATIC SmartXS ...
Page 30: ...PE 607 USA_FA 2 1 30 Dismantling of the housing parts ...
Page 45: ...Suggested piping arrangement for combined operation 45 Installation Manual PELLEMATIC SmartXS ...
Page 49: ...Wiring diagrams 49 Installation Manual PELLEMATIC SmartXS ...
Page 50: ...PE 607 USA_FA 2 1 50 Wiring diagrams ...
Page 51: ...Wiring diagrams 51 Installation Manual PELLEMATIC SmartXS ...
Page 52: ...PE 607 USA_FA 2 1 52 Wiring diagrams ...
Page 96: ...PE 607 USA_FA 2 1 96 Pellet boiler cautionary markings ...
Page 97: ...Pellet boiler cautionary markings 97 Installation Manual PELLEMATIC SmartXS ...
Page 98: ......
Page 99: ......