Starting up for the first time
65
114
4
Starting up for the first time
After verifying all installation work has been correctly completed and pellet fuel has been delivered, it is
time to commission the boiler.
A
Aiirr ttiig
gh
htt p
prro
op
pe
errtty
y o
off c
co
om
mb
bu
ussttiio
on
n c
ch
ha
am
mb
be
err
To ensure correct combustion and overall operation, all
fittings to the combustion chamber must be correctly
assembled to be completely air-tight.
Note:
The unit must be started up for the first time by an authorized MESys service technician.
Before starting up the pellet boiler, the following settings must be made in the sequence specified below:
1.
Output test - test all motors
2. Settings in heating controller (if installed)
3. Start the pellet boiler
Use the checklist enclosed to document the start-up procedure.
14.1 Adjusting the boiler control unit
Fundamental settings for the boiler are made during Periphery Learning.
14.1.1 Settings in the boiler controller
Parameters that you must adjust to the relevant boiler type.
Boiler power rating
Setting in the Boiler power rating (only possible after periphery
learning)
Boiler setpoint temperature
Setting the boiler setpoint temperature, default 158° F
Switch-off temperature
Setting the switch-off temperature, default 165° F
Boiler-controlled pump
Setting the function of the boiler-controlled pump, Speed controller
On/Off, if a accumulator is connected.
De-ashing system
Activating the de-ashing system
Level detection system
Activating the level detection system, if weighing cells are installed
(optional)
14.1.2 Checklist for checking the heating system
The checklist is intended to help authorized specialists perform and document a comprehensive check on the
heating system.
Name and adress of the customer
Heating device
Name:
Pellematic Smart XS:
Street:
Rated power:
Place:
Year of build:
Name and adress of installer
Manufacturer`s serial number:
Name:
Type of heating controller:
Installation Manual PELLEMATIC® SmartXS
Summary of Contents for PELLEMATIC SmartXS
Page 29: ...Dismantling of the housing parts 29 Installation Manual PELLEMATIC SmartXS ...
Page 30: ...PE 607 USA_FA 2 1 30 Dismantling of the housing parts ...
Page 45: ...Suggested piping arrangement for combined operation 45 Installation Manual PELLEMATIC SmartXS ...
Page 49: ...Wiring diagrams 49 Installation Manual PELLEMATIC SmartXS ...
Page 50: ...PE 607 USA_FA 2 1 50 Wiring diagrams ...
Page 51: ...Wiring diagrams 51 Installation Manual PELLEMATIC SmartXS ...
Page 52: ...PE 607 USA_FA 2 1 52 Wiring diagrams ...
Page 96: ...PE 607 USA_FA 2 1 96 Pellet boiler cautionary markings ...
Page 97: ...Pellet boiler cautionary markings 97 Installation Manual PELLEMATIC SmartXS ...
Page 98: ......
Page 99: ......