Street:
Type of accumulator:
Place:
Solar device:
D
Da
am
ma
ag
ge
e tto
o p
prro
op
pe
errtty
y
Use the checklist to check the heating system before
starting up for the first time.
CHECKLIST
Yes
Comment
Textile tank
Textile tank
Are the struts mounted?
Are all stayers straightened vertical?
Delivery unit
Is the slot for the emercency gate valve closed with an ad-
hesive tape?
Filling coupling
Are the filling couplings correctly installed?
Are the plugs at the filling couplings?
Are the safety labels placed? (Caution – Switch off the heat-
ing systembefore entering)
Are the couplings correctly grounded?
Aeration
Is the storage room / building properly ventilated with mini-
mum 27 square inches to the outside?
Caution label
Is the caution label "Wood pellets storage room" placed on
the door to the storage room?
Fire protective collar
Are fire protection collars mounted in the storage room?
Pellematic Smart XS
Burner plate
Is the position of the burner plate correct?
Has the locking screw of the burner plate been tightened?
Flame tube
Has the locking device of the concrete flame tube been
removed?
Is the position of the stainless steel flame tube centred and
upright?
Sensors
Check the position and fixing of the sensors.
After the start of the boiler, check if the values of the sen-
sors are in a realistic range.
Washer nozzle
Is the washer nozzle positioned upright?
(The connecting pipe must be positioned horizontally)
Boiler cover
Check that the cover of the flue gas collector chamber is
properly fitted, leak-tight and fastened down.
Flue gas pipe
connection
Is the flue gas pipe made of stainless steel?
Is the flue gas pipe leak-tight?
Does the flue gas pipe have a gradient?
No movable parts?
No damper?
Combustion cham-
ber door
Check that the combustion chamber door closes correctly.
Drain
Is the connection pipe tight?
Aeration/boiler
room
Exists the required aeration opening?
PE 607 USA_FA 2.1
66
Summary of Contents for PELLEMATIC SmartXS
Page 29: ...Dismantling of the housing parts 29 Installation Manual PELLEMATIC SmartXS ...
Page 30: ...PE 607 USA_FA 2 1 30 Dismantling of the housing parts ...
Page 45: ...Suggested piping arrangement for combined operation 45 Installation Manual PELLEMATIC SmartXS ...
Page 49: ...Wiring diagrams 49 Installation Manual PELLEMATIC SmartXS ...
Page 50: ...PE 607 USA_FA 2 1 50 Wiring diagrams ...
Page 51: ...Wiring diagrams 51 Installation Manual PELLEMATIC SmartXS ...
Page 52: ...PE 607 USA_FA 2 1 52 Wiring diagrams ...
Page 96: ...PE 607 USA_FA 2 1 96 Pellet boiler cautionary markings ...
Page 97: ...Pellet boiler cautionary markings 97 Installation Manual PELLEMATIC SmartXS ...
Page 98: ......
Page 99: ......