83
Extraction system not con-
veying pellets
►
Pellet bridge - destroy bridge and make sure ma-
terial flows properly
Suction fan unplugged
►
Connect up suction fan
Storage room auger motor
unplugged
►
Connect up storage room motor
13.18 Ashbox full (Fault 5044) – Ash Warning (Fault 5053)
Display:
[5044] PE Ashbox full
Description:
Moter doesn’t reach the normal speed after 3 attempts.
Display:
[5053] PE Ash Warning
Description:
Ash-box nearly full
Cause and Remedy:
Ash-box full
►
Clear ash-box
Ash-box not completely
closed
►
Close ash-box
End-switch defect
►
Replace end-switch
13.19 Ball lock (Smart, Condens and Compact only – Fault 5045)
Display:
[5045] PE Ball lock
– Smart, Condens and Compact only
Description:
No pellets detected from capacitive sensor (KAP RA)
Cause and Remedy:
Pellet reserves depleted
►
Refill storage-Room / supply tank
Capacitve sensor RA
defect
►
Replace Capacitve sensor RA
13.20 Burner Motor / Ash box full (SMART, Condens and Compact only – Fault 5047)
Display:
[5047] Burner Motor /Ash box full
- SMART, Condens and Compact only
Description:
The alarm text is displayed after the motor has made 3 unsuccessful attempts to
reach the normal speed of the external de-ashing system.
Cause and Remedy:
Ash box is full
►
Empty ash box
Rotation of burner auger
or ash auger is blocked
►
Ensure rotation of auger
13.21 Container cover open (PEB only – Fault 5052)
Display:
[5052] PE Container cover open
Description:
Container cover open (PEB only) – Input AK
Cause and Remedy:
Cover open
►
Close cover
End-switch defect
►
Replace end-switch
13.22 Pellets Warning (Fault 5054)
Display:
[5054] PE 1 Pellets Warning
Description:
Measured pellets capacity (AE2) is below the threshold
Cause and Remedy:
Pellets nearly empty or
empty
►
Fill up with pellets
Installation Manual PELLEMATIC® SmartXS
Summary of Contents for PELLEMATIC SmartXS
Page 29: ...Dismantling of the housing parts 29 Installation Manual PELLEMATIC SmartXS ...
Page 30: ...PE 607 USA_FA 2 1 30 Dismantling of the housing parts ...
Page 45: ...Suggested piping arrangement for combined operation 45 Installation Manual PELLEMATIC SmartXS ...
Page 49: ...Wiring diagrams 49 Installation Manual PELLEMATIC SmartXS ...
Page 50: ...PE 607 USA_FA 2 1 50 Wiring diagrams ...
Page 51: ...Wiring diagrams 51 Installation Manual PELLEMATIC SmartXS ...
Page 52: ...PE 607 USA_FA 2 1 52 Wiring diagrams ...
Page 96: ...PE 607 USA_FA 2 1 96 Pellet boiler cautionary markings ...
Page 97: ...Pellet boiler cautionary markings 97 Installation Manual PELLEMATIC SmartXS ...
Page 98: ......
Page 99: ......