OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
6
Quick Start
1. Set up the software with the desired parameters (see page 8).
2. Prepare the cell caps and cell body.
3.
Assemble the bottom cell cap. See page 19.
4. Install the bottom cell cap to the bottom of the cell body. See page 20.
5.
Assemble the top cell cap. See page 21.
6.
Assemble the SGSM shaft assembly and install it to the top cell cap.
See page 24.
7. Install the top cell cap to the cell assembly.
8. Install the test cell to the cabinet.
9. Connect the SGSM head to the shaft assembly and run a drag check.
10.
Mix the slurry and fill the cell. See page 28.
11. Connect water supply line, thermocouple, and transducer to the test cell.
12. Run the test. See page 31.
13.
Allow test cell to cool down. See page 34.
14. Evaluate the test data. See page 33.
15. Remove test cell.
16. Disassemble and clean the cement from the test cell. See page 35.
17. Clean and inspect all of the test cell components.