OFITE, 11302 Steeplecrest Dr., Houston, TX 77065 USA / Tel: 832-320-7300 / Fax: 713-880-9886 / www.ofite.com
42
Appendix
Filling The Cell
This section applies to earlier models of the UCA.
1. Place the bottom cell cap in a vice with the threads facing upward.
2. Carefully screw the cell body onto the bottom cell cap completely. Then
unscrew the cell body ¼ of a turn. This will facilitate disassembly later.
3.
Begin filling with the cement slurry. Place the fill gauge on top of the test
cell. Fill the cell until the cement touches the bottom of the fill gauge.
4. Carefully screw the top cell cap into the test cell, just as you did with the
bottom cell cap.
Fill Gauge (#120-50-018)
Fill Gauge
(#120-51-021)
High Pressure SGSM
Low Pressure SGSM