Configuration management
45
Test for credit
The service technician will have defined whether the copier
tests for sufficient credit before producing a copy. The availability of this
option depends on the type of device being used (not all devices have a credit
test option). For example, if no testing is carried out and there is only one credit
unit left, the credit is used before the copier discovers that the job requires 2
credit units (which is applicable to double-sided copies and/or A3 copies, as
determined by the key operator). A test is carried out, no copy will be
produced. The user can then add another credit unit, or use the credit already
deducted to make another copy.
[29] Copy charge device
▼
(De)activating the copy charge device
1
Access the key operator system (see page 14).
2
Open the ‘Accounting’ section and select ‘Copy charges’ (see figure 29).
3
Press the ‘Copy charge device’ function button to select ‘On’ or ‘Off’.
4
When ready, exit the key operator system.
Summary of Contents for 31x5E
Page 1: ...Oc 31x5E Configuration and special maintenance...
Page 8: ...8 Oc 31x5E Configuration and special maintenance...
Page 24: ...24 Oc 31x5E Configuration and special maintenance...
Page 72: ...72 Oc 31x5E Configuration and special maintenance...
Page 90: ...90 Oc 31x5E Configuration and special maintenance...
Page 102: ...102 Oc 31x5E Configuration and special maintenance...
Page 118: ...118 Oc 31x5E Configuration and special maintenance...
Page 119: ...119 Oc 31x5E Configuration and special maintenance Appendix A Safety information...
Page 142: ...142 Oc 31x5E Configuration and special maintenance...
Page 146: ...146 Oc 31x5E Configuration and special maintenance...
Page 147: ...147 Oc 31x5E Configuration and special maintenance Appendix C Miscellaneous...
Page 156: ...156 Oc 31x5E Configuration and special maintenance W waiting time 58 warm up time 12...