Dokument
D
GB-0600 Dokum D Anbaugeräte
- 3 -
PÖTTINGER Landtechnik GmbH
Industriegelände 1
A-4710 Grieskirchen
Tel. 07248 / 600 -0
Telefax 07248 / 600-2511
T
Machine checked according to delivery note. All attached parts removed. All safety equipment, drive shaft and operating
devices at hand.
T
Operation and maintenance of machine and/or implement according to operating instructions explained to the customer.
T
Tyres checked re. correct pressure.
T
Wheel nuts checked re. tightness.
T
Drive shaft cut to correct lenght.
T
Correct power-take-off speed indicated.
T
Fitting to tractor carried out: to three-point linkage
T
Trial run carried out and no defects found.
T
Functions explained during trial run.
T
Pivoting in transporting and operating position explained.
T
Information given re. optional extras.
T
Absolute need to read the operating manual indicated.
Please check.
X
According to the product liability please check the above mentioned items.
INSTRUCTIONS FOR
PRO DUCT DELIVERY
GB
In order to prove that the machine and the operating manual have been properly delivered, a confirmation is necessary.
For this purpose please do the following:
- sign
the
document A
and send it to the company Pöttinger or via the internet to www.poettinger.at
-
document B
stays with the specialist factory delivering the machine.
-
document C
stays with the customer.