318
RLC Installation and Administration Guide
Troubleshooting
Standard 4.0
You can abort the PSTN tests at any time and return the system to normal
operation mode. The start and end of PSTN tests are recorded as display logs. To
view these display logs, access Configuration Manager
→
Alarms/Logs/Stats
→
Display Logs.
If the system reports that it cannot perform PSTN tests, determine the following:
1.
Is the PSTN enabled on the Remote Gateway 9100 Series unit?
2.
Is the Remote Gateway 9100 Series unit enabled?
Note:
During testing, the system reports the status of the test on each RLC
port.The meaning of each status message is shown in the following table:
WARNING
During PSTN testing, do not make any configuration
changes or perform a Save to Flash on the RLC or
Remote Gateway 9100 Series unit involved in the PSTN
testing.
No
Status Message
Comments
1
Trunk up
Link was brought up successfully to the specified
number and Remote Gateway 9100 Series unit port.
2
Attempt Failed
Attempt made to call specified number failed.
3
Port Busy
The specified port is in use and cannot be tested.
4
No Remote Port
Available
There is no Remote Gateway 9100 Series unit port
available to bring up trunk on specified port.
5
Security Failed
There was a security failure while bringing up the trunk.
Check security configuration settings.
6
Abnormal Failure
There is an abnormal failure on this connection due to
errors on the line or an emergency call on the Remote
Gateway 9150 unit.
8
Not Closed
In non-disruptive mode, this trunk bandwidth is being
used for voice calls and could not be freed.
9
Primary not up
If the primary trunk can not be brought up, all additional
trunks show this status.
10
Primary Abnormal Fail
All additional trunks show this message if the primary
trunk experiences an abnormal failure during testing.
11
Not data port
The specified port is not configured as a data port.
12
Attempt by Remote
Failed
Attempt by the Remote Gateway 9100 Series unit to
bring up trunks from remote side failed.
Summary of Contents for RLC
Page 2: ......
Page 4: ......
Page 6: ...vi RLC Installation and Administration Guide Publication history Standard 4 0 ...
Page 16: ...xvi RLC Installation and Administration Guide Contents Standard 4 0 ...
Page 26: ...xxiv RLC Installation and Administration Guide About this document Standard 4 0 ...
Page 102: ...76 RLC Installation and Administration Guide Planning for RLC installation Standard 4 0 ...
Page 132: ...106 RLC Installation and Administration Guide Installing the RLC Standard 4 0 ...
Page 262: ...236 RLC Installation and Administration Guide Configuring the RLC Standard 4 0 ...
Page 376: ...350 RLC Installation and Administration Guide Planning forms Standard 4 0 ...
Page 402: ...376 RLC Installation and Administration Guide Sample configuration files Standard 4 0 ...
Page 448: ...422 RLC Installation and Administration Guide Fields Index Standard 4 0 ...
Page 465: ......