Maintenance
5-20
P/N 7146386A
E
2008 Nordson Corporation
VBN w/o Control System
Filling Valve
Available only with option
Level control with filling connection
.
If material seeps out of the air relief hole, the control module must be
replaced.
Fig. 5-24
Air relief hole
Replacing Control Module
Nordson recommends keeping a supply of control modules on hand to
prevent disruptions in production.
NOTE:
Replace only when the control module is warm and the material is
soft (approx. 70
°
C / 158
°
F, depending on material).
WARNING:
System and adhesive pressurized. Relieve system pressure.
Failure to observe can result in serious burns.
1. Disconnect air supply and electrical connection.
2. Release screws M5 and extract control module from the warm filling
valve.
3. Put new control module in place and tighten screws crosswise.
4. Re-connect air supply and electrical connection.
NOTE:
Observe voltage shown on solenoid valve ID plate.
Control air pressure:
4 to 6 bar
400 to 600 kPa
58 to 87 psi
The quality of the compressed air must be at least class 2 in compliance
with ISO 8573
−
1. This means:
S
Max. particle size 30
m
m
S
Max. particle density 1 mg/m
3
S
Max. pressure dew point
−
40
°
C
S
Max. oil concentration 0.1 mg/m
3
.
Summary of Contents for VersaBlue 100H/100H
Page 46: ...Installation 3 14 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Page 74: ...Maintenance 5 24 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Page 94: ...Repair 7 14 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Page 96: ...Parts 8 2 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...