Installation
3-2
P/N 7146386A
E
2008 Nordson Corporation
VBN w/o Control System
Removing Melter
Run the melter until empty, separate all connections from the melter, and
allow the melter to cool down.
Disposing of Melter
When your Nordson product has exhausted its purpose, dispose of it
properly according to local regulations.
Installation Requirements
Set up only in an environment that corresponds to the stated Degree of
Protection (Refer to section
Technical Data
). Do not set up in a potentially
explosive atmosphere! Protect from vibration.
CAUTION:
Protect the control panel from direct sunlight. The UV rays
reduce the service life of the liquid crystals.
Exhausting Material Vapors
Ensure that material vapors do not exceed the prescribed limits. Always
observe the safety data sheet (MSDS) for the material to be processed. If
necessary, exhaust material vapors and provide sufficient ventilation of the
location of the system.
Fig. 3-2
Summary of Contents for VersaBlue 100H/100H
Page 46: ...Installation 3 14 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Page 74: ...Maintenance 5 24 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Page 94: ...Repair 7 14 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Page 96: ...Parts 8 2 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...