![Nidek Medical ICE mini Operator'S Manual Download Page 29](http://html1.mh-extra.com/html/nidek-medical/ice-mini/ice-mini_operators-manual_1688064029.webp)
19
2
2.
OPERATING PROCEDURES
2.1
Start-up
1
Connect the power cord to the inlet.
2
Make sure that the power switch is turned off
(
) and connect the power cord to a wall
outlet.
3
Make sure that the cables from the connected instruments are securely connected to the
ICE mini, and the power for each instrument is turned on.
See “4.2 Connection” (Page 67) for the connecting method.
4
Turn on (
) the power switch.
1) The blocker starts to initialize, and "ICE
mini" is displayed on the LCD touch
screen.
Wait for a while until the screen changes with-
out touching the ICE mini.
• The electrical outlet must have a grounding terminal.
Electric shock or fire may occur in the event of instrument failure or electric leak.
• Never overload the electrical outlet.
A branch outlet that is concurrently used with other instruments may cause overheating and fire.
Inlet
Power switch
(NCUJ41/.QCFKPI
0QY.QCFKPI
%QORNGVG
4&#$1168GTF
+06'..+)'06$.1%-'4
ICE mini
Summary of Contents for ICE mini
Page 1: ...INTELLIGENT BLOCKER Model ICE mini OPERATOR S MANUAL...
Page 8: ...VI...
Page 24: ...14 BEFORE USE Labels Side and rear views...
Page 28: ...18 BEFORE USE Before First Use...
Page 72: ...62 MAINTENANCE List of Replacement Parts...
Page 90: ...80 SPECIFICATIONS AND ACCESSORIES Standard Configuration...
Page 92: ...82 INDEX X X inside value 7 Y Y inside value 7...
Page 93: ......