32
3
After click “Next”, it will turn to the third interface “3/5 nozzle assign edit”. Left part will show which type of
nozzle be used, also will count the times it was used. Right part will be the assignment against nozzle count times. If you
wanna adjust it, please directly double-click the nozzle type and fill into the one you need. If any nozzle head is not
available to use, please directly set the related nozzle type as blank, then click “Next”.
4
5
The fourth is “placement list placement sequence edit”, it is showed the optimized placement sequence, please
directly click “Next”
(1)select a footprint from New footprint list
(2)select a similar footprint from footprint library
(3)click Add to footprint library or
Add to alias library