![background image](http://html.mh-extra.com/html/nec/express5800-120rf-2/express5800-120rf-2_user-manual_251205130.webp)
4-26
Upgrading Your System
Installing a PCI Option Board
!
CAUTION
Each riser card supports either a low-profile or full-height
PCI boards. Before installing a PCI board, check the type of
PCI board you are installing. When installing a PCI board,
confirm that the card connector matches the connector of
the riser card.
1.
Observe the safety and ESD precautions listed under
General Information
and
Static Precautions
at the beginning of this chapter.
2.
Perform the steps in "Preparing Your System for Upgrade" described earlier
in this chapter.
3.
Extend the server out from the rack.
4.
Remove the top cover of the system chassis. See
Top Cover Removal
found
earlier in this chapter.
!
CAUTION
For proper cooling and airflow, do not operate the system
with the top cover removed. Always
replace
the top cover
before powering on the system.
5.
Lift straight up and remove the riser card from the server. See Figure 4-24.
A
B
A
Riser card slot dedicated to low-profile PCI boards
B
Riser card slot dedicated to full-height PCI boards
Figure 4-24. Removing Riser Cards
6.
Unlock and open the retainer clip. See Figure 4-25.
Summary of Contents for Express5800/120Rf-2
Page 1: ... U s e r s G u i d e EXPRESS5800 120Rf 2 ...
Page 2: ......
Page 4: ......
Page 10: ...viii Contents ...
Page 61: ...Setting Up the System 2 29 Figure 2 34 Making Connections ...
Page 80: ......
Page 186: ...5 22 Problem Solving ...
Page 187: ...A Specifications System Specifications ...
Page 197: ...C Interrupt Requests ...
Page 199: ...Interrupt Requests C 3 ...
Page 209: ...10 Glossary ...
Page 214: ...xx ...
Page 215: ... 456 01669 000 ...