Installation and commissioning
59
The Big Sonic-Ski® junction box
The junction box should be mounted in such a way that simple
wiring to the controller and the sensors is possible. The
connections for the sensors should always point downwards so
that no water can penetrate into the junction box. Inputs which
are not required must be sealed with dust protection caps.
The input plug connector should always ideally point in the
direction of travel.
Using an M6 x 12 hexagon socket screws (1), the junction box (2)
will be initially assembled on the mounting plate (3).
Then the mounting plate (3) will be assembled using a M8 star
knob screw (4) to one of the central sliding brackets (5).
When assembling the Big Sonic-Ski® on the right-hand side of
the machine, the box should be assembled on the inside of the
support mechanics so that the input plug connector also points in
the direction of travel in this instance. Then slide the
corresponding sliding bracket, on which the junction box is to be
assembled, from the inside towards the outside on the support.
Summary of Contents for MOBA-Matic MMC-1000
Page 7: ...Table of contents 7 12 Declaration of conformity 161 ...
Page 79: ...Operation 79 Graphical representation of the user menu ...
Page 161: ...Declaration of conformity 161 12 Declaration of conformity ...
Page 162: ...162 Declaration of conformity ...
Page 163: ...Declaration of conformity 163 ...
Page 164: ...164 Declaration of conformity ...
Page 165: ...Declaration of conformity 165 ...
Page 166: ...166 Declaration of conformity ...
Page 167: ...Declaration of conformity 167 ...
Page 168: ...168 Declaration of conformity ...
Page 171: ...Notes ...