
[
IX
Troubleshooting ]
- 303 -
HWE09130
GB
3. Troubleshooting flow chart for LEV Solenoid valve
(1) LEV
Check whether the electric expansion
valve and the solenoid valve connector
are not disconnected or not loose.
Run the cooling operation or the heating
operation in the system in trouble
(only in one system).
No cooling capacity
No heating capacity
Repair the fault.
Fault is found.
Note 1
NO
Check that LEV1 is fully open.
Check that LEV1 is fully open.
Check that SVA and SVC are ON.
Check that SVA and SVC are OFF.
Cooling or heating operation
Note 2
Heating operation
Check whether LEV3 is controlling
superheat.
Check LEV1.
Check LEV3.
Check SVA and SVC.
Check SVB.
LEV1 is fully open.
Check whether LEV 3 is controlled by
the value of the differential pressure.
LEV1 is fully open.
Note 3
Note 2
Note 3
YES
NO
Cooling operation
Superheat control OK
Differential pressure OK
YES
NO
Check that SVB is OFF.
Check that SVB is ON.
SVA, SVC ON
SVA, SVC OFF
YES
YES
NO
Completed
SVB OFF
SVB ON
YES
YES
YES
YES
NO
NO
NO
NO
NO
Summary of Contents for PURY-P120
Page 1: ...Models PURY P72 P96 P120 P144T Y JMU A PURY P168 P192 P216 P240 P264 P288T Y SJMU A ...
Page 11: ... 2 ...
Page 25: ... 16 ...
Page 36: ... II Restrictions 27 HWE09130 GB ...
Page 50: ... II Restrictions 41 41 HWE09130 GB ...
Page 67: ... 58 II Restrictions GB HWE09130 ...
Page 69: ... 60 ...
Page 95: ... 86 III Outdoor Unit Components GB HWE09130 ...
Page 97: ... 88 ...
Page 105: ... 96 IV Remote Controller GB HWE09130 ...
Page 107: ... 98 ...
Page 125: ... 116 ...
Page 145: ... 136 ...
Page 175: ... 166 VII Control GB HWE09130 ...
Page 177: ... 168 ...
Page 203: ... 194 ...
Page 363: ... 354 IX Troubleshooting GB HWE09130 ...
Page 365: ... 356 ...