[2] Controlling the Outdoor Unit
-1- Outline of Control Method
The outdoor units are designated as OC and OS in the order of capacity from large to small (if two or more units have the
same capacity, in the order of address from small to large).
The setting of outdoor unit can be verified by using the self-diagnosis switch (SW1).
The OC determines the operation mode and the control mode, and it also communicates with the indoor units.
The OS exercises autonomous distributed control (over defrost, error detection, and actuator control etc.) according to the
operation/control mode signals that are sent from the OC.
-2- Startup sequence rotation
At the initial startup, outdoor units start up in the order of "OC and OS." When the cumulative operation time of the OC reaches
two hours, the OS will start up before the OC at the next start up.
Startup sequence rotation is performed while all the indoor units are stopped. (Even after two hours of operation, startup se-
quence rotation is not performed while the compressor is in operation.)
In a system with multiple outdoor units (OC and OS), when the integrated operation time of the unit in operation (either OC or
OS) reaches one hour during a cooling operation at low outside temperature, that unit will stop and the other unit will go into
operation.
Refer to [-10-Control at Initial Start-up] for the initial startup.
Performing startup sequence rotation does not change the basic operation of OC and OS. Only startup sequence is changed.
Startup sequence of the outdoor units can be checked with the self-diagnosis switch (SW1) on the OC.
-3- Initial Control
When the power is turned on, the initial processing of the microcomputer is given top priority.
During the initial processing, control processing of the operation signal is suspended. (The control processing is resumed after
the initial processing is completed. Initial processing involves data processing in the microcomputer and initial setting of each
of the LEV opening. This process will take up to 5 minutes.)
During the initial processing, the LED monitor on the outdoor unit's control board displays S/W version -> refrigerant type
-> heat pump -> cooling only and capacity -> and communication address in turn every second.
-4- Control at Start-up
The upper limit of frequency during the first 3 minutes of the operation is 50 Hz.
When the power is turned on, normal operation will start after the initial start-up mode (to be described later) has been com-
pleted (with a restriction on the frequency).
Display
SW1
ON
1 2 3
5
4
6 7 8 9 1 0
The unit is designated as the OC: “oc” appears on the display.
The unit is designated as OS: “oS” appears on the display
Display
SW1
OC→OS: “oc” and the “OC” address appear alternately on the display.
OS→OC: “oS” and the “OS” address appear alternately on the display.
ON
1 2 3
5
4
6 7 8 9 1 0
Summary of Contents for PURY-P120
Page 1: ...Models PURY P72 P96 P120 P144T Y JMU A PURY P168 P192 P216 P240 P264 P288T Y SJMU A ...
Page 11: ... 2 ...
Page 25: ... 16 ...
Page 36: ... II Restrictions 27 HWE09130 GB ...
Page 50: ... II Restrictions 41 41 HWE09130 GB ...
Page 67: ... 58 II Restrictions GB HWE09130 ...
Page 69: ... 60 ...
Page 95: ... 86 III Outdoor Unit Components GB HWE09130 ...
Page 97: ... 88 ...
Page 105: ... 96 IV Remote Controller GB HWE09130 ...
Page 107: ... 98 ...
Page 125: ... 116 ...
Page 145: ... 136 ...
Page 175: ... 166 VII Control GB HWE09130 ...
Page 177: ... 168 ...
Page 203: ... 194 ...
Page 363: ... 354 IX Troubleshooting GB HWE09130 ...
Page 365: ... 356 ...