10 Troubleshooting
5. After the new O-ring is in place, insert the sample tube back into the sample port until it is
fully seated.
6. Slide the sample tube connector nut up the tube until it comes in contact with the port fitting
(the ferrule and O-ring will move along with the connector nut). Then, turning clockwise,
hand tighten the connector nut to the sample connector.
R
ECOVER FROM A
P
OWER
F
AILURE
The analyzer saves entered and collected data in case of power failure. File parameters and any
other data entered will still be present when power is restored. If an analysis was in progress when
the power failure occurred, it will be canceled when the analyzer restarts. Any data collected
during the analysis will still be present, but the analysis should be restarted in order to produce
complete results.
O
IL
-
BASED
V
ACUUM
P
UMP
The
Vacuum Pump Guide
can be found on the Micromeritics web page (
).
10 - 26
Gemini VII Operator Manual
239-42828-01 (Rev H ) — May 2021
Summary of Contents for GEMINI VII
Page 1: ...OPERATOR MANUAL 239 42828 01 May 2021 Rev H GEMINI VII SURFACE AREA ANALYZER ...
Page 10: ......
Page 16: ......
Page 92: ......
Page 126: ...6 About Reports SAMPLE LOG REPORT 6 34 Gemini VII Operator Manual 239 42828 01 Rev H May 2021 ...
Page 127: ...T PLOT REPORT t Plot Report Gemini VII Operator Manual 239 42828 01 Rev H May 2021 6 35 ...
Page 128: ...6 About Reports VALIDATION REPORT 6 36 Gemini VII Operator Manual 239 42828 01 Rev H May 2021 ...
Page 234: ......
Page 242: ......
Page 244: ......
Page 247: ......
Page 248: ......