XZR400 Series User’s Manual
6
97472 Issue 3, August 2018
INSTALLATION
2 INSTALLATION
It is essential that the installation of the electrical and gas
supplies to this analyzer be undertaken by qualifi ed personnel.
2.1
Unpacking the Analyzer
Open the box and unpack carefully as follows. Save all the packing materials for the
purpose of returning the instrument for any warranty claims.
1.
Remove the accessories (if ordered with the analyzer). If no accessories
have been ordered the box should contain the following items:
•
XZR400 Series Oxygen Analyzer
•
Power cable (except XZR400A2 model)
• User’s
Manual
•
Test result sheet
2.
Remove the documentation and packing material.
3.
Remove the analyzer and power cable.
2.2 Preparation
Carefully read the following guidelines before installing the analyzer. If you are not sure
about the installation conditions and other important factors please contact a Michell
Instruments’ Application Engineer or a Michell Instruments’ representative prior to the
installation.
The following list will help you to identify the recommended preparation steps:
•
The analyzer should be installed at ambient temperatures between 0 and
+55°C (32 to +131°F).
•
The location of the installation should allow access to the display.
•
The location of the installation should not expose the analyzer to any
vibration.
•
The cables should not be exposed to extreme temperatures and mechanical
strain.