5. Press soft keys 1 to toggle between 120 Hz and 1000 Hz.
6. To start the test press the TEST button.
The MTR105 determines if the load is inductive, capacitive or
resistive automatically.
7. During the tests,
The primary field displays the result for the reactive
component. (This could be capacitance, inductance or
resistance).
The secondary field displays the frequency.
9.2 Capacitance or inductance
1. Connect the test leads to the MTR105.
1.1. Press the Information
(
)
button to view the lead set
up diagram.
NOTE:
When the diagram is displayed a test cannot be
performed. Press Information
(
)
button to return to the test
screen.
Inductance (L); Capacitance (C); Resistance (R) (LCR)
www.megger.com
49
Summary of Contents for MTR105
Page 1: ...Baker Instruments MTR105 Rotating Machine Tester User Guide ...
Page 7: ... www megger com vii ...
Page 92: ... 86 www megger com ...
Page 93: ... www megger com 87 ...
Page 94: ... 88 www megger com ...
Page 95: ... www megger com 89 ...
Page 96: ... 90 www megger com ...
Page 97: ... www megger com 91 ...
Page 98: ... 92 www megger com ...
Page 99: ... www megger com 93 ...