7. The result can be saved by pressing the SAVE button. A
message will inform you the data was saved and which asset
ID it was saved to.
5.3 Supply Phase Rotation
1. Connect the test leads to the MTR105.
1.1. Press the Information (
) button to view the lead set
up diagram.
NOTE:
when the diagram is displayed a test cannot be
performed. Press Information
(
)
button to return to the test
screen
2. Turn rotary switch to select Voltmeter (V) position.
3. Press soft keys 2 and 3 to move the carousel left or right
through sub-modes to Supply Phase Rotation.
NOTE:
The full title text of the sub-mode will appear in the
secondary field for a few seconds.
Voltmeter
30
www.megger.com
Summary of Contents for MTR105
Page 1: ...Baker Instruments MTR105 Rotating Machine Tester User Guide ...
Page 7: ... www megger com vii ...
Page 92: ... 86 www megger com ...
Page 93: ... www megger com 87 ...
Page 94: ... 88 www megger com ...
Page 95: ... www megger com 89 ...
Page 96: ... 90 www megger com ...
Page 97: ... www megger com 91 ...
Page 98: ... 92 www megger com ...
Page 99: ... www megger com 93 ...