![ME-Messysteme GSV-2AS User Manual Download Page 8](http://html1.mh-extra.com/html/me-messysteme/gsv-2as/gsv-2as_user-manual_1757596008.webp)
Connection diagram 15-pole SUB-D connector
Table 5: Connection of Full-, Half- and Quarterbridge sensors to the 15-pole SUB-D connector
All ground connections are individually protected by interference suppressor inductors in the GSV. Terminals
GND
B
are connected to the housing via interference suppression inductor. Currents above 1A between the
terminals and the housing result in damage to the interference suppression inductor. Before connecting,
please check whether housing, supply ground, the ground of your data acquisition system and your port are
at the same potential.
Connection and start-up
Connecting the sensor
A strain gage full bridge or a load cell is connected to the amplifier's terminal block as
shown below:
4- Wire technology
6-Wire technology
1)
:
Sensor
Clip 2
Sensor
Clip 2
Sensor supply -
Clip 7
Sensor supply -
Clip 7
Sensor
Clip 4
Sensor
Clip 4
Sensor signal -
Clip 5
Sensor signal -
Clip 5
Sense wire +
Clip 3
Sense wire -
Clip 6
ME-Meßsysteme GmbH, Neuendorfstr. 18a, D-16761 Hennigsdorf
8
Phone 03302 78620 60, Fax 03302 78620 69,
,
www.me-systeme.de/en
Summary of Contents for GSV-2AS
Page 65: ......