2. PCE-MCA 50 Hardware Parts & Accessories
2.1 Unpacking & Inspection
At the factory each new PCE-MCA 50 passes a careful inspection. It should
be free of scrapes and scratches and in proper operation order upon
receipt. The receiver should, however, inspect the unit for any damage that
may have occurred during transit. If there are signs of obvious mechanical
damage, package contents are incomplete, or the instrument does not
operate according to specifications, contact the purchasing sales office as
soon as possible. The standard accessories are as follows:
If you have to return the instrument to the factory for any reason, use the
original packing whenever possible. Include a detailed description of the
reason for the return.