This chapter explains what kind of simultaneous duties PCE-MCA 50 can
do.
All of the following tasks may run independently, but the window settings
decide what is shown:
➢
One measurement in the measurement terminals. Electrical
Measurement terminals in PCE-MCA 50.
➢
Either one measurement or one Source/Measure in the
Source/Measure
terminals of PCE-MCA 50.
Also: During thermocouple measurement/simulation the RTD
terminals may be used for measuring the reference junction
temperature (
CJC Mode
field set to
External RTD
).
Additionally, all of the connectors on the left side of PCE-MCA 50 may
have an independent task. Below Illustrate the Possible Parallel Functions
of PCE-MCA 50.
OR
OR
OR
6. General Specifications