Part Number 020002365 08/25/2015 23
Section 2
Installation
CONNECTING SUPPLY LINES
Pre-installation of towers is required and the appropriate
syrup supply must be connected to the corresponding
tower. The valves are numbered 1-6, 1-8, or 1-10 from left to
right viewing from the front of the tower.
1. For a two (2) tower installation, refer to the Syrup
Supply Line Diagram below. The syrup product supply
boxes can be positioned on a BIB rack in a convenient
location near the soda system.
Dispensing Tower No. 1
“T”
Connections
John Guest to Adapter
Syrup
Supply
Syrup
Coils
Note: Some
equipment may
provide more
product cooling
capability.
6
5
3
1
4
2
Syrup Supply Line Diagram (Valve #6 Water Only)
NOTE: Refer to the optional equipment component
installation instructions for completion (if applicable) of the
beverage system. Do not connect the syrup supply at this
time.
2. Locate the conduit supply lines for the refrigeration
unit. There are four (4) 1/2" (1.27 cm) carbonated
water lines marked in sets for the system. Connect
the yellow carbonated water supply line (7) to the
yellow carbonated water return line (A). Connect
the blue carbonated water supply line (8) to the
blue carbonated water return line (B). Refer to the
Carbonated Water Supply Line Diagram below.
Two Circulation Pumps – Two Circuits
Circ.
Pump
Carb.
Tank
Heat
Exchanger
Circ.
Pump
Carb.
Tank
Conduit
Conduit Tee
Tower 1
Tower 2
Refrigeration Unit
Heat
Exchanger
Blue
Yellow
Yellow
Blue
Interlaced Tower
Two Circulation Pumps – Two Circuits
Circ.
Pump
Carb.
Tank
Heat
Exchanger
Circ.
Pump
Carb.
Tank
Conduit
Conduit Tee
Tower 1
Tower 2
Refrigeration Unit
Heat
Exchanger
Non-interlaced Tower