Section 3: Performance Verification
3-2
3.3 PERFORMANCE TESTS
The battery charge and battery performance test should be performed before
monitor repairs whenever the battery is suspected as being a source of the
problems. All other tests may be used following repairs or during routine
maintenance (if required by your local institution. Before performing the battery
performance test, ensure that the battery is fully charged (Paragraph 3.3.1).
This section is written using Nellcor factory-set power-up defaults. If your
institution has preconfigured custom defaults, those values will be displayed.
3.3.1 Battery Charge
Perform the following procedure to fully charge the battery.
1. Connect monitor to AC power source using proper power cord.
2. Verify BATTERY CHARGING/AC SOURCE indicator is lit.
3. Charge battery for at least 8 hours.
Note: The battery may require a complete charge/discharge cycle to restore its
normal capacity, depending on its previous usage.
4. The only way to check for a full charge is to perform the procedure in
paragraph 3.3.2 “Battery Performance Test.”
3.3.2 Battery Performance Test
1. The NPB-4000 monitor is specified to typically operate on battery power a
minimum of 4 hours, at 25° C, with no printing, and one NIBP measurement
every 15 minutes. The NPB-4000/C monitor is specified to typically operate
on battery power a minimum of 3 hours, at 25° C, with no printing, and one
NIBP measurement every 15 minutes. Before performing this test, ensure
that the battery is fully charged (paragraph 3.3.1).
2. Connect
Nellcor
SRC-2 pulse oximeter tester to monitor viaEC-8 sensor cable.
3. Connect NIBP simulator to monitor via SHBP-10 hose.
4. Set SRC-2 switches as follows:
SWITCH
POSITION
RATE
38
LIGHT
LOW
MODULATION
LOW
RCAL/MODE
RCAL 63/LOC
Summary of Contents for NELLCOR NPB-4000
Page 66: ... THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 68: ...Section 7 Spare Parts 7 2 Figure 7 1 NPB 4000 C Top Assembly Drawing ...
Page 70: ...Section 7 Spare Parts 7 4 Figure 7 2 NPB 4000 C Front Case Assembly Diagram Sheet 1 of 2 ...
Page 72: ...Section 7 Spare Parts 7 6 Figure 7 3 NPB 4000 C Front Case Assembly Diagram Sheet 2 of 2 ...
Page 74: ...Section 7 Spare Parts 7 8 Figure 7 4 NPB 4000 C Rear Case Assembly Diagram Sheet 1 of 2 ...
Page 76: ...Section 7 Spare Parts 7 10 Figure 7 5 NPB 4000 C Rear Case Assembly Diagram Sheet 2 of 2 ...
Page 78: ...Section 7 Spare Parts 7 12 Figure 7 6 NPB 4000 C Power Supply Heat Sink Assembly Diagram ...
Page 80: ... THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 96: ... THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 114: ... THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 140: ... THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 180: ... THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 192: ... THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 208: ... THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 210: ... THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 211: ...Section 17 Drawings 17 3 Figure 17 1 MP 205 PCB Schematic Sheet 1 of 2 ...
Page 212: ...Section 17 Drawings 17 5 Figure 17 2 MP 205 PCB Schematic Sheet 2 of 2 ...