215009
181
Revision A
Installing the Conditioner
This procedure is applicable when the header is not attached to the windrower. If necessary, detach the header from the
windrower before proceeding. Refer to header operator
’
s manual for instructions.
1018520
A
B
B
C
Figure 4.168: Lifting Conditioner
1.
Attach spreader bar (A) to the forklift (or an equivalent
lifting device) and attach chains to lugs (B) on the
conditioner. Use a chain rated for overhead lifting with a
minimum working load of 1135 kg (2500 lb.).
WARNING
Ensure spreader bar is secured to the forks so that it cannot
slide off the forks or towards the header while attaching the
conditioner to the header. Failure to do so could result in death
or serious injury.
2.
Lift conditioner (C) and align it with the header opening.
1018548
A
B
C
Figure 4.169: Installing Conditioner
3.
Carefully align pin (B) at each end of conditioner (A) with
lug (C) on the header. Lower conditioner (A) until pins (B)
engage lugs (C) on the header. Avoid contact between the
top of the conditioner and the center-link anchor.
1023363
A
Figure 4.170: Left Side of Conditioner
–
Right Side Similar
4.
Align the mounting holes and install four M16 x 40 hex
head bolts (A) with the heads facing inboard (two per side).
Secure with M16 center lock flanged nuts. Do
NOT
tighten.
Summary of Contents for R113 SP
Page 3: ...Declaration of Conformity Figure 1 EC Declaration of Conformity 1029750 215009 i Revision A...
Page 4: ...Figure 2 EC Declaration of Conformity 1029751 215009 ii Revision A...
Page 14: ......
Page 210: ......
Page 214: ......
Page 222: ......
Page 232: ......
Page 238: ......