Lucent Technologies 415B Battery Plant for 4ESS
5 - 12 System Testing
Issue 6 September 1999
then an ACF, when power is first removed. Observe that
the ACF LEDs on the rectifiers light while ac is failed.
7. Restore the system to normal by closing all breakers
previously opened.
Galaxy
Controller
The Galaxy Controller for the 415B Battery Plant is ordered as
J85501F-1, L4. Table 5-C lists the circuit packs furnished with
the controller.
Table 5-D lists the optional circuit packs/kits.
The Galaxy Controller is configured at the factory. Refer to the
section on Configuration in the Galaxy Controller product
manual (Select Code 167-792-122).
Table 5-C: Circuit Packs/Kit Furnished with the
Galaxy Controller
Power Supply
BJJ1
Independent Controller
BJB2
Intelligent Controller
BJH3
Remote Peripheral Monitor (RPM) Interface
BJM1
Fuse Board
BJF4
Terminal Board
BJT1
Display
BJG1
Alarm Board
BJE1
Rectifier Interface
BJC1
Basic Power Board
BJA1
Battery Reserve Time Prediction Kit
K1
Table 5-D: Optional Circuit Packs
for the Galaxy Controller
Modem
BJL2
Data Switch
BJK1