Lucent Technologies 415B Battery Plant for 4ESS
Issue 6 September 1999
System Installation 4 - 11
unit until the display matches the clamp-on ammeter
reading. See Step 2 of this section.
11. The EGCM has its own scan point, OAOO, in the 4ESS
office alarm system.