Lucent Technologies 415B Battery Plant for 4ESS
2 - List of Figures
Issue 6 September 1999
Figure 7-8: Connecting AC to the Rectifiers
Figure 7-9: Partial Sketch of CM2 (208G)
Figure 7-10: CM1 (329B) Fuse Board
Figure 7-11: Partial Sketch of CM3 Digital Meter Board 7 - 26
Figure 7-12: Bracket Mounting Locations
Figure 7-13A: AC Distribution Floor Mounting
Figure 7-13B: AC Distribution Wall Mounting
Figure 7-14: Typical Floor Mounting Detail
Figure 7-15: Floor Mounting Template for Control
Figure 7-16: AC Breaker Locations with Spare
Figure 7-17: Connecting the AC to the Rectifier
Figure 7-18: Connections for the RPM