Lucent Technologies 415B Battery Plant for 4ESS
Issue 6 September 1999
Retrofit of 415A Battery Plant 7 - 31
Display will now show the total current for the 415A and 415B
on the laptop.
Note: To read total current from the front panel of the
Galaxy Controller, follow Menu›Meas›Drv Chan.
Press Enter. This is the total current from all modules and
the 415B Galaxy Controller current.
Current readings on the Galaxy display are from the 415A
module connected to the Galaxy shunt input terminals, pins 1
and 2.
Select Configure›Monitoring›Shunt Channels›Modify.
Change Shunt Current to “500A” and Shunt Voltage mVolts
to “50”. Click OK›OK.
Select Modify. Click Copy. Select and highlight all channels.
Click OK›OK›OK›OK›Close.
Verify amperage and alarms.
System
Installation and
Testing for
Retrofit
Group 4 (5
Rectifier Plant)
Please read Section 3, Safety, carefully before installing, testing,
maintaining, or repairing the 415A Battery Plant or any of its
subsystems.
Unpacking
Equipment
Contact the shipping carrier if there is damage to the equipment.
Follow the shipping carrier's procedure for filing a damage
claim, if necessary.
Required Tools
The following equipment is required to handle the shipping
containers, remove framework from the shipping containers, and
erect framework into final position. The minimum lifting
capacity is 1500 pounds.
DANGER
The voltage in this plant can cause serious injury. 140
volts is considered to a hazardous voltage. Be sure
qualified personnel are present when working with live
circuits. Wear rubber gloves as required.