Methods
Getting Started
Installing the
Neon
™
Device with
Pipette Station
1.
Unpack the Neon
™
device as instructed on page vi.
2.
Four power cords are shipped with the device to ensure that the cord you use
is compatible with your local socket format.
3.
Place the Neon
™
device on a level laboratory bench. Keep the area around the
unit clear to ensure proper ventilation of the unit.
Note:
The Neon
™
device has a small footprint and can be easily set up in the tissue
culture hood for convenience.
4.
For your safety:
Position the device properly such that the
power
switch and
AC inlet located on the rear of the unit (page vii) are easily accessible. Be sure
to position the device such that it is easy to disconnect the unit.
Note:
Since Neon
™
device is air-cooled, its surface may become hot during operation.
When installing the device, leave a space of more than 10 cm from the back of the device.
5.
Place the Neon
™
Pipette Station near the Neon
™
device.
6.
Connect the high voltage and sensor connector on the Neon
™
Pipette Station to
high voltage port and sensor port on the rear side of Neon
™
device,
respectively.
Be sure to align the ridge indicated by a white arrow on the sensor connector
on the Neon
™
Pipette Station with a groove indicated by a white dot on the
sensor port of the Neon
™
device (see figure below for details).
Important!
To connect or disconnect the sensor connector to the Neon
™
device,
always handle the sensor connector using the cord plug and not the cord cable.
7.
Ensure the AC power switch is in the
Off
position (page vii).
Continued on next page
6