User Manual
Page 16
Installation
This chapter gives step-by-step instructions about how to install the switch:
Selecting a Site for the Switch
As with any electric device, you should place the switch where it will not be subjected to
extreme temperatures, humidity, or electromagnetic interference. Specifically, the site you
select should meet the following requirements:
-The ambient temperature should be between -40°C to 75
℃
(-40
℉
to 167
℉
).
-The relative humidity should be less than 95 percent, non-condensing.
-Surrounding electrical devices should not exceed the electromagnetic field (RFC)
standards.
-Make sure that the switch receives adequate ventilation. Do not block the ventilation
holes on each side of the switch.
Connecting to Power
AC inlet power socket:
Step 1: Connect the supplied AC power cord to the receptacle on the back of the switch,
and then plug it into a standard AC outlet with a voltage range from 100 to 240 VAC. Turn
on the AC power switch at the back panel to turn on the switch.
Step 2: Turn off the AC switch if you want to shut down the switch.
Terminal Block power input:
Summary of Contents for IES-2881
Page 1: ...IES 2881 24 100FX SFP 4 GE Combo SFP Managed Switch 40 to 75C User Manual v1 00 1206...
Page 37: ...User Manual Page 37 Reboot to restart the switch Logout to logout of the switch...
Page 41: ...User Manual Page 41 RMON Statistics Click Port 1 Port 28 to view corresponding RMON Statistics...
Page 44: ...User Manual Page 44...
Page 49: ...User Manual Page 49...
Page 54: ...User Manual Page 54...
Page 63: ...User Manual Page 63 802 1p Priority 1 down list to choose 0 3 for VLAN Priority 0 7 2...
Page 64: ...User Manual Page 64 DSCP 1 down list to choose 0 3 for DSCP Priority 0 63 2 DSCP...
Page 162: ...User Manual Page 162...