7. Check inside the unit for any obvious unsafe conditions, such as metal filings, contamination, water or
other liquids, or signs of fire or smoke damage.
8. Check for worn, frayed, or pinched cables.
9. Check that the power-supply cover fasteners (screws or rivets) have not been removed or tampered with.
Grounding requirements
Electrical grounding of the server is required for operator safety and correct system function. Proper
grounding of the electrical outlet can be verified by a certified electrician.
© Copyright Lenovo 2015, 2017
xi
Summary of Contents for ThinkServer TS150
Page 14: ...xii ThinkServer TS150 User Guide and Hardware Maintenance Manual ...
Page 18: ...4 ThinkServer TS150 User Guide and Hardware Maintenance Manual ...
Page 52: ...38 ThinkServer TS150 User Guide and Hardware Maintenance Manual ...
Page 116: ...102 ThinkServer TS150 User Guide and Hardware Maintenance Manual ...
Page 124: ...110 ThinkServer TS150 User Guide and Hardware Maintenance Manual ...
Page 136: ...122 ThinkServer TS150 User Guide and Hardware Maintenance Manual ...
Page 146: ...132 ThinkServer TS150 User Guide and Hardware Maintenance Manual ...
Page 147: ......
Page 148: ......