![Lauda RE 1050 G Operating Instructions Manual Download Page 31](http://html1.mh-extra.com/html/lauda/re-1050-g/re-1050-g_operating-instructions-manual_4088318031.webp)
ECO GOLD
28.04.10/ YACE0088
Putting the device into operation
31
7
Putting the device into operation
7.1
Mains connection
Make sure that the details on the name-plate match mains voltage and frequency.
Device according to EMC standard EN 61326-1, refer to (
Ì
−
The separable plug is used as disconnecting device.
The separable plug shall be readily identifiable and easily reached by the operator.
−
Only connect units to sockets having a safety earth conductor (PE).
−
No liability is accepted for incorrect mains connection.
−
Ensure that if not using an external load, the pressure nozzle is closed off or short-
circuited to the return nozzle.
−
Ensure that the unit is filled according to section (
Ì
7.2
Switching on
−
Switch on the device with the mains switch at the front.
1 s
−
An acoustic signal sounds for approx. 1 s. (Example: depends
on device type and equipment).
−
The adjacent display appears for approx. five seconds with
the corresponding version numbers of the software.
−
The displayed versions are: Control and Safety. If present,
Cool and External Pt100 are displayed.
−
Other modules are displayed in
Æ
Setup
Æ
Device Status
Æ
software version
(if these modules are also
installed).
−
When making technical queries, please have the device serial
number (
Ì
LAUDA
Control
1.20
Safety
1.20
Cool
1.20
Ext
Pt
1.20
Summary of Contents for RE 1050 G
Page 2: ......