![Lauda RE 1050 G Operating Instructions Manual Download Page 21](http://html1.mh-extra.com/html/lauda/re-1050-g/re-1050-g_operating-instructions-manual_4088318021.webp)
ECO GOLD
28.04.10/ YACE0088
Preparations
21
6
Preparations
6.1
Assembly and siting
a) Immersion thermostat
−
Push the screw clamp on the underside of the
control head into the guide rails.
−
Insert the thermostat with the screw clamp into
the tempering vessel (
Ì
10) and screw the clamp
tightly to the bath edge by turning the knurled
screw.
−
With plastic baths the tubular heating element
must not contact the bath wall.
−
Do not cover the ventilation opening on the back
of the device.
−
Keep a distance of at least 20 cm free on all
sides of the device.
Operation with Cooling Coils LCZ 0720 and LCZ 0721
(
Ì
The cooling coil can only be mounted on one side of
the control head. This is located on the side with the
mains switch (refer to illustration).
−
Use a soft underlay to avoid scratches to the
upper side of the control head.
−
Withdraw the mains plug.
−
To fit the cooling coil loosen the two cross-head
screws on the blind flange and remove it.
−
Place the flange of the cooling coil in the position
of the removed blind flange and push the flange
with holes underneath it.
Flange with holes
−
With the two cross-head screws, screw the car-
rier plate of the cooling coil and the flange with
holes to the underside of the control head.
Summary of Contents for RE 1050 G
Page 2: ......