![Lauda RE 1050 G Operating Instructions Manual Download Page 23](http://html1.mh-extra.com/html/lauda/re-1050-g/re-1050-g_operating-instructions-manual_4088318023.webp)
ECO GOLD
28.04.10/ YACE0088
Preparations
23
c) Cooling bath and circulation thermostats
−
Do not tilt the device and never turn it upside
down.
−
If possible after transport, site the device two
hours before putting it into operation.
−
Do not cover the ventilation openings at the
back of the device and on the lower part of the
device.
−
Keep a distance of at least 40 cm free on all
sides of the device.
−
Set the flow distribution to INT (
Ì
during operation as a bath thermostat (without
external load) the flow is discharged from the
opening for the internal bath circulation.
−
During operation as a bath thermostat without
an external load and with the pump connec-
tion set fitted, the outflow nozzle of the pump
connection set must be closed (use sealing
plug) or short circuited with the return nozzle.
−
For bath temperatures above 70
°C attach the
sticker
included in the supplied
items to an easily visible point on the bath.
−
Operation with external load (circulation ther-
mostat) (
Ì
−
The device can be operated up to an ambient temperature of 40
°C.
−
An increased ambient temperature results in reduced cooling power.
−
When putting the chiller into operation after a lengthy shut-down period, up to 30 minutes
may pass until the rated cooling power is available depending on room temperature and
device type.
Summary of Contents for RE 1050 G
Page 2: ......