SKY899
Installation Manual
009-11900-001
Installation - Page 2-39
Revision F
July 18, 2013
2.28.2 Display Installation
Figure 2-16 shows a typical display installation. The display can be mounted to the instrument panel from
the front or from the rear. An optional mooring clamp is available for increased stability in high-vibration
environments.
Figure 2-16: Display Installation
Use Rivnuts
®
or a mooring clamp to secure the display to the instrument panel.
NOTE
1.
The mooring clamp is not furnished with the display.
2.
A mooring clamp (P/N 78-8060-5856-2) can be ordered when the
order for the display is placed.
3.
A 3ATI mooring clamp is also available from:
MSP, Incorporated
R.R. 4, Box 383A
Nashville, Indiana 47448
Tel. (812) 988-6623 or FAX (812) 988-6181