Operation
246
Pos: 48.77 /BA/Bedienung /R undballenpr esse/N etz-Garnbindung/N etz über U mlenkroll e @ 342\mod_1432731379785_78.docx @ 2589814 @ @ 1
3
0 -
50
m
m
4
5
2
1
VP-3-008
Fig. 198
• Insert net (3) over the deflection shaft (1) under the net spreader (2) between rubber roll (4)
and pressure roll (5). The net must hang approx. 0 to 50 mm over the scraper of conveyor
roller or cutting roller.
Fig. 199
• Pull flat bar (1) to the front
• Fold net spreader (2) down and ensure that it engages.
Pos: 49 /Layout M odul e /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1