Operation
232
Pos: 48.58.23 /BA/Bedi enung /R undball enpresse/N etz-Garnbindung/Garn führ en1_Bil d_F orti ma F @ 334\mod_1429536956984_78.docx @ 2551513 @ @ 1
FOR00094
3
4
5
6
7
4
1
2
3
Fig. 178
Pos: 48.58.24 /BA/Bedi enung /R undball enpresse/N etz-Garnbindung/Garn führ en1_Text_Forti ma F @ 334\mod_1429537049956_78.docx @ 2551605 @ @ 1
• Guide the both twines (3) out of the eyes (1) through the twine retainers (2).
• Guide the both twines (3) through the eyes (5) of the twine brake (6).
• Guide the both twines (3) between the spring compressors (4) and the screws (7).
Pos: 48.58.25 /BA/Bedi enung /R undball enpresse/N etz-Garnbindung/Garn führ en2_Bil d_F orti ma F @ 334\mod_1429268208148_78.docx @ 2549908 @ @ 1
Fig. 179
Pos: 48.58.26 /BA/Bedi enung /R undball enpresse/N etz-Garnbindung/Garn führ en2_Text_Forti ma F @ 334\mod_1429268259026_78.docx @ 2549939 @ @ 1
• In case of net tying and twine tying version, swivel the net spreader (2) into the upper
position.
• Ensure that the net spreader (2) is held in the link of guide iron (1).
Pos: 48.58.27 /Layout M odul e /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0.docx @ 4165 @ @ 1