Operation
239
Pos: 48.60.24 /BA/Bedi enung /R undball enpresse/N etz-Garnbindung/N etzbreithalter @ 342\mod_1432729335898_78.docx @ 2589394 @ @ 1
Fig. 187
Note
If net tying is available, the net spreader (2) must be swivelled into the upper position when
using twine tying.
The link in the guide iron (1) ensures that the net spreader (2) is held in its position.
Fig. 188
• Open cleaning valves (3) of twine tying.
• Turn twine tying manually on the stepped pulley in the working direction (see arrow).
• Remove soiling in area (4).