![Krone BiG Pack 870 HDP XC Original Operating Instructions Download Page 70](http://html1.mh-extra.com/html/krone/big-pack-870-hdp-xc/big-pack-870-hdp-xc_original-operating-instructions_2004796070.webp)
7
Initial operation
7.6
Setting the bale chute
70
BiG Pack 870 HDP XC
Original Operating Instructions 150000760_00_en
1
BPG000-018
Move control units of tractor to float position.
Relieve all pressure from the hydraulic system of tractor and machine.
Shut down and safeguard the machine,
.
Operation of machine without Load Sensing
On tractors with open hydraulic system (constant flow system), refer to operating instructions of
tractor manufacturer.
Screw out system screw (1) as far as it will go.
Operation of machine with Load Sensing
In case of tractors with closed hydraulic system (constant pressure system or Power Beyond
system), refer to operating instructions of tractor manufacturer. In this process, the message line
is connected.
Screw in the system screw (1) as far as it will go.
7.6
Setting the bale chute
When it is unfolded, the bale chute represents an extension of the bale channel. In order to
make sure that big bales are set down on the ground correctly, the back edge of the bale chute
must not be set too high above the ground. Otherwise the bales will be damaged when they are
placed on the ground.
1
2
2
BP000-091