Operation
9
Operation of machine without bale chute
9.22
BiG Pack 870 HDP XC
Original Operating Instructions 150000760_00_en
115
1
3
2
BP000-253
The baling pressure on the bale channel flaps can be adjusted on the hydraulic control block
“baling force control” (1) on the left-hand machine side under the side hood.
Shut down and safeguard the machine,
.
.
Disconnect the plug connection (2) on the solenoid valve.
Unscrew the knurled head screw (3) entirely.
After switching on the universal shaft, the machine builds up a baling pressure of aprox. 100 -
110 bar/1450 - 1595 PSI.
After finishing work
Shut down and safeguard the machine,
.
Unscrew the knurled head screw (3) entirely.
Connect the plug connection (2) on the solenoid valve and lock it.
Close side hood,
Releasing baling flaps (for “Comfort 1.0" version)
1
3
2
BP000-439
The seat valve “Releasing baling flaps" (2) is located on the right next to the hydraulic control
block “baling force control” (1) on the left-hand machine side under the side hood.
Shut down and safeguard the machine,
.
In order to release the baling flaps, screw in the knurled head screw (3).
9.22
Operation of machine without bale chute
It is necessary to operate the machine without bale chute if for example a bale collector is
connected to the rear of the machine.