103
EN-114B_f.1294
"Note", "Warning" or
"Fault" is shown.
■
Check what type of message it is. Acknowledge the message.
■
If necessary, notify your contractor
"Screed drying" is
selected.
■
No action required
■
As soon as the period for screed drying has expired, the heat pump
continues in the selected operating program.
Rooms are too hot
Cause
Remedy
Settings made
at the heat pump
control unit have
been
changed or are
incorrect.
Central heating/central cooling must be enabled. Check the fol
-
lowing settings and correct if required:
■
Operating program.
■
Room temperature.
■
Time.
■
Time program for central heating/central cooling.
■
Central cooling time program for buffer cylinder.
■
Heating curve/cooling curve.
■
If necessary, select central cooling for the buffer cylinder.
■
Enable "Active cooling mode" if required.
"Note", "Warning" or
"Fault" is shown.
■
Check what type of message it is. Acknowledge the message.
■
If necessary, notify your contractor.