(5) Boom and arm connection pin (1 place)
(6) Bucket cylinder foot pin (1 place)
(7) Arm cylinder rod pin (1 place)
(8) Arm and link connection pin (1 place)
(9) Arm and bucket connection pin (1 place)
(10) Link connection pin (2 places)
(11) Bucket cylinder rod pin (1 place)
(12) Bucket and link connection pin (1 place)
EVERY 100 HOURS MAINTENANCE
Maintenance for every 10 hours service should be performed at the same time.
METHOD FOR LUBRICATING SWING CIRCLE
Items to be prepared
Grease pump
MAINTENANCE PROCEDURE
MAINTENANCE
4-42
Summary of Contents for PC700LC-11
Page 2: ......
Page 23: ...LOCATION OF SAFETY LABELS 5 SAFETY SAFETY LABELS 2 3...
Page 66: ......
Page 316: ......
Page 396: ......
Page 397: ...SPECIFICATIONS 5 1...
Page 401: ...For 7 6m Boom SPECIFICATIONS SPECIFICATIONS 5 5...
Page 402: ...SPECIFICATIONS SPECIFICATIONS 5 6...
Page 426: ......
Page 427: ...REPLACEMENT PARTS 7 1...
Page 434: ......