DS560/DS570 User's Guide - Rev. A04
StorCase Technology, Inc.
Installation
15
4.
The drive carrier is now ready to be inserted into the receiving frame.
NOTE:
The lock on the Data Express receiving frame functions as a lock
and a DC power switch for the carrier unit. The lock must be
engaged in order to supply power to the carrier and installed
drive.
5.
Reboot the computer. The new disks is now ready for use, although it may have
to be formatted or initialized prior to use with your operating system and
applications software.
WARNING:
Unlocking the carrier unit switches DC power off to the drive.
Since disk drives require a short amount of time to spin down,
allow about 15 seconds before pulling the carrier unit out of the
receiving frame to avoid possible damage to the drive.
All manuals and user guides at all-guides.com